The Buzzi Unicem River 7000 project required upgrades to the existing barge loading facility to handle the daily production. The upgrades consisted of new conveyors feeding a new cement silo to loadout by rail as well as new conveyors to loadout by barge.
A new loadout tower, conveyors and dust collections system was installed on top of a river dauphin to increase the efficiency for barge loading.