Goodwin Brothers was responsible to install the cement conveying equipment from the harbor silos to the rail loadout facility. This scope included the rail loadout structural steel, chutes, dust collection, gates, air slides as well as structural steel inside the harbor silos to support the new electrical and compressor rooms to support the harbor loadout operations.