This project consisted of a new drinking water system for Jefferson County Missouri, supplied by a collector well along the Mississippi River.
The scope of this project included site grading, mass rock excavation, a raw water influent line, aerator, claricone lime clarifier, carbon dioxide injection system, chlorine & lime feed equipment, prestressed concrete clearwell, filters, blowers, backwash storage tank, lime sludge lagoon, and finished water distribution line.